Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - T20CM06438
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
09/14/2023 | ENGR Engineering Final | Not Ready | I spoke with Kappcon Superintendent Jorge # (520) 495-9552 and went over entry way area located at SW corner of 18th st. and 6th ave. where sidewalk and ramp area will have planter to be installed on drop off areas of 18” and will need to be installed prior to recall of Engineering final I will review with Martin Hernandez and call Jorge on Friday the 15th of September regarding the 18” area. | |
10/04/2023 | ENGR Engineering Final | Not Ready | 1) Patio behind single story structure needs to be completed. 2) ADA parking sign is on wrong side and van accessible needs to be made to code and be 8’ in width. |
|
10/19/2023 | ENGR Engineering Final | Partial Pass | Handicap space located in NW parking lot will need asphalt tapered over striped edge on both left and right sides and re-striped. Handicap railing located at the SW corner of 6th and 18th will need crack in concrete repaired on the far SE end and recalled for inspection when completed. The trash enclosure located in the North side parking lot will need (2) cap blocks re- grouted and recalled for inspection when completed. |
|
10/24/2023 | ENGR Engineering Final | Passed |