Permit: T20CM06438

Parcel: 11707226B


Addresses:

747 S 6TH AV

Inspection Status: Not Ready

Inspection History: COT - LCBU - Framing

Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Framing Not Ready
04/06/2022 COT - LCBU - Framing JBURGE Partial Approval Entered by VVERA1 - Partial. North 1st floor canopy ceiling; Southeast exterior walls; parking garage electric room. Ok to one side sheet rock progress areas.
03/25/2022 COT - LCBU - Framing JBURGE Partial Approval Entered by NGARCIA3 - Partial. Level #1, North, East, West, and one interior wall in place, clips as per plan; Ok to one side sheet rock of progress areas.
09/14/2023 COT - LCBU - Framing Passed