Permit: T20CM06438

Parcel: 11707226B


Addresses:

747 S 6TH AV

Inspection Status: Not Ready

Inspection History: COT - LCEL - Electrical Intermediate

Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Intermediate Not Ready
10/14/2022 COT - LCEL - Electrical Intermediate JBURGE Partial Approval Entered by NGARCIA3 - Partial. Interior shafts in apartments from level #1 - level #3; 1/2" - 2" conduits within the shafts.
09/21/2022 COT - LCEL - Electrical Intermediate JBURGE Partial Approval Entered by NGARCIA3 - Partial. East side over head canopy; canned light system in place. Apartments on level #3 are not ready for inspection.
09/15/2022 COT - LCEL - Electrical Intermediate JBURGE Partial Approval Entered by NGARCIA3 - Partial. In wall electric in Apartments #210 - 270.
09/08/2022 COT - LCEL - Electrical Intermediate JBURGE Not ready for Inspection Entered by NGARCIA3 - Not ready. Contractor cancelled. Will reschedule for 13 September.
07/12/2022 COT - LCEL - Electrical Intermediate JBURGE Partial Approval Entered by NGARCIA3 - Partial. Level #2 apartment demising walls only (7). Ok to cover demising walls.
03/22/2023 COT - LCEL - Electrical Intermediate Partial Pass Room #310; in wall electric and west shaft for panel placement.
04/05/2023 COT - LCEL - Electrical Intermediate Partial Pass Room #310, panel set in place (150 amp); Suite #102, in wall electric: need to pull wire and complete panels.
09/14/2023 COT - LCEL - Electrical Intermediate Passed
COT - LCEL - Electrical Intermediate Partial Pass partial approval for third floor guest rooms excluding 310