Inspection Status: Not Ready
Inspection History: COT - LCPL - Gas Pressure Test
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCPL - Gas Pressure Test |
|
Not Ready |
|
| 10/17/2022 |
COT - LCPL - Gas Pressure Test |
JBURGE |
Approved |
Entered by VVERA1 - Approved. Inspection performed on 14 October
|
| 10/14/2022 |
COT - LCPL - Gas Pressure Test |
JBURGE |
Partial Approval |
Entered by NGARCIA3 - Partial. Low pressure and medium pressure lines from building to East stub-ups for main line connection. Ok to cover progress areas.
|
| 10/13/2022 |
COT - LCPL - Gas Pressure Test |
JBURGE |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready. Site locked; no one present. 3:15 pm. |
| 11/14/2022 |
COT - LCPL - Gas Pressure Test |
|
Passed |
Approved- 14 units (210-270) and (310-370) on the 2nd and 3rd levels |