Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - T20CM05977
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/19/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
01/13/2022 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - FINAL IS PARTIAL, OK FOR TCO BUT NOT FOR THE FINAL. THERE IS EXTERIOR WORK HAPPENING ON THE EAST AND NORTH SIDE OF THE EXISTING STRUCTURE THAT SHOULD REQUIRE THAT A DEVELOPMENT PACKAGE PERMIT BE ISSUED. THE ENGINEERING FINAL WILL NOT BE APPROVED TILL THE FOLLOWING ITEMS ARE ADDRESSED: TALK WITH THE ENGINEERING AND ZONING REVIEW STAFF TO DETERMINE IF A DEVELOPMENT PACKAGE AND/OR WALL PERMIT IS REQUIRED FOR THE WALL THAT IS UNDER CONSTRUCTION. DISCUSS THE MODIFICATIONS TO T;HE EXISTING DRAINAGE PATTERNS FOR THIS SITE AND THE SURROUNDING AREAS. |