Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
RSBU - Building Final |
|
Not Ready |
|
| 02/02/2023 |
RSBU - Building Final |
|
Re-inspection required |
install hard landings at all exterior doors the width of the open and 36” deep, 7 breakers required to be arc-fault, the kitchen required two 20 Amp circuits, install street address numbers on front of house |
| 02/07/2023 |
RSBU - Building Final |
|
Re-inspection required |
kitchen requires two 20 amp circuits, install 2 more outlets on kitchen backsplash, all wire splices in the panel require wire nuts |
| 02/08/2023 |
RSBU - Building Final |
|
Passed |
|