Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2020 | PLUMBING - FINAL | Approved | approved Clear gas meter Verbal clearance called in 2:14 pm. |
|
| 06/23/2020 | PLUMBING - FINAL | Denied | denied 1- Gas air pressure test was at zero psi at the time of inspection request. |
|
| 06/11/2020 | PLUMBING - FINAL | Denied | denied 1- Shall contract a license plumbing contractor to provide a air pressure test on the entire gas system. |