Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2020 | ELECTRIC - FINAL | Approved | Ap Clear dgc |
|
| 09/03/2020 | ELECTRIC - FINAL | Partial Approval | PARTIAL, Inspection for PV Interconnection. (120/208V, 300AMP PV Disconnect. #350 CU Conductors Terminated on load side of existing 600AMP SES Main Breaker) Verbal clearance sent to TEP @ 10:30PM to After hours line. (RECN/DGL) |