Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 04/28/2020 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
CSST PASSING THROUGH RETURN AIR PLENUM MUST BE SLEAVED AND SEALED AT BOTH ENDS. CSST ON EXTERIOR MUST HAVE FACTORY COATING IN TACT. CSST SHOULD BE SECURED WITH TWO HOLE CLAMPS. |
| 04/28/2020 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
Clear Southwest Gas. |