Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/26/2021 |
ENGINEERING - FINAL |
|
Approved |
APPROVED |
| 08/24/2021 |
ENGINEERING - FINAL |
|
Partial Approval |
PARTIAL /NEED ONE MORE RAIL AT THE BOTTOM OF THE HANDRAIL THE SOUTH END OF PARKING LOT |
| 08/18/2021 |
ENGINEERING - FINAL |
|
Partial Approval |
9027 (ENGINEERING - FINAL) PARTIAL THE PATIO AREA NEED WATER HARVESTING,THE SIDEWALK AREA OFF OF 17 ST. NEED ADDRESS .RAILING IN THE PARKING LOT AREA BY THE FENCE IS NEED. |