Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2020 | PLUMBING - GAS PRESSURE TEST | Approved | approved Clear gas meter Verbal clearance called in 1:09 pm |
|
| 06/19/2020 | PLUMBING - GAS PRESSURE TEST | Denied | denied 1- Shall provide the required test gage of 15 lbs max with 1/10th in tenth increments and system test of 10 psi minimum. 2- Shall provide combustion air openings for water heater room. 3- Shall provide (3) sheet metal screws per joint on the water heater draft collar and all vent connector joints. 4- Shall terminate the water heater t & p drain to daylight or provide a drain pan and cap off pan drain outlet and terminate the t & p drain into the pan. 5- Shall provide a sediment trap for the water heater and AC unit. 6- Shall seal the gas line penetration at exterior wall. 7- Shall provide a ground bond on gas line. 8- Shall provide a carbon monoxide detector and locate it in the hallway to the bedrooms. |
|
| 05/20/2020 | PLUMBING - GAS PRESSURE TEST | Denied | denied 1- Pressure test gage was at zero psi. Shall provide a minimum of 10 psi for 15 minutes on the entire gas system. Check the system for leaks. |
|
| 05/12/2020 | PLUMBING - GAS PRESSURE TEST | Denied | 1- I left a message at 8:56am for someone to call me so that we could set up a video inspection time for today before 3:00 pm. | |
| 05/08/2020 | PLUMBING - GAS PRESSURE TEST | Denied |