Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2020 | PLUMBING - ROUGH, SOIL | Approved | ||
| 03/04/2020 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall provide directional fittings on all horizontal to horizontal waste lines. 2- Combination Tee Wye for the lavatory waste line is in a reversed. 3- Shall provide a minimum of 18 inches of stand pipe for the Clothes Washer waste line. 4- Shall locate the horizontal vent for the tub a minimum of 6 inches above the flood level rim of the fixture. 5- Shall provide a Mission specialty coupling when connecting plastic to cast iron. 6- Shall provide vents for the lavatory and tub and Clothes Washer. |