Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2021 | ELECTRIC - CONSTRUCTION POWER | Approved | ||
| 03/10/2021 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | NOT READY CANNOT VERIFY BOND AND UFFER GROUND | |
| 03/27/2020 | ELECTRIC - CONSTRUCTION POWER | Partial Approval | Clear TEP ECO NOTE: INSPECTION WAS CHANGED TO PA SO CONTRACTOR COULD RE-CALL DUE TO TEP REQUIRED PANEL CHANGE. A NEW CLEARANCE WILL BE REQUIRED |