Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 11/17/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
|
| 05/28/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Partial. Masonry wall footing at Gl: C/1.2-4. Ok to place concrete in progress area. |
| 05/27/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Partial. Shear wall North at GL: 1; Shear wall center at GL: B/2-5; column footings at GL: 1.2/C; 2/C; 3/C; 4/C; 5/C; 6/C; 7/C; wall footing at GL: C/1.2-7. Ok to place concrete in progress areas. |
| 05/26/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Partial. Column footings at GL: A/1; A/1.2; A/2; A/3; A/4; A/5. Ok to place concrete in progress areas. |
| 05/22/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Partial. Elevator sump footings at GL: B.6/8; South Shear wall at GL: B/8; Central shear wall at GL: B/5.2; column footings at GL: 6.7/B (F-22); 6/B (F-22); A/8; A/7.8; A/7; A/6. Ok to please concrete in progress areas |