Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2020 |
ELECTRIC - FINAL |
|
Approved |
|
| 02/25/2020 |
ELECTRIC - FINAL |
|
Denied |
Condensate piping not properly supported, provide maximum 48 inch spacing, provide pressure-treated lumber or equal. Condensate piping to be coated for UV protection. Condensate piping not properly terminated. Unit data plate not properly identified. Electrical conduit requires roof jack at all roof penetrations. Service receptacle not properly wired, provide circuit from maximum 20 amp breaker, outlet is to be GFCI protected. |
| 02/21/2020 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
Provide access to roof. |
| 02/19/2020 |
ELECTRIC - FINAL |
|
Denied |
no access and no ladder called contact and left message no answer |
| 02/05/2020 |
ELECTRIC - FINAL |
|
Partial Approval |
Provide permit for rooftop air-conditioning. |