Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/14/2020 |
BUILDING ABOVE CEILING |
|
Approved |
all Approved |
| 06/15/2020 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. 3rd floor, except booth room area. |
| 05/22/2020 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Partial. Level #1; Ok to set ceiling tiles. |
| 04/14/2020 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Heartland areas only. |
| 03/24/2020 |
BUILDING ABOVE CEILING |
|
Partial Approval |
Kickers not installed at time of framing inspection, these will be looked at building above ceiling. |