Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2021 | SITE - SEWER | Approved | Approved | |
| 07/21/2020 | SITE - SEWER | Denied | denied 1- Shall provide directional fittings for all horizontal to horizontal drainage. 2- Shall provide a double pattern wye when connecting to branch lines together. 3- No threaded fittings allowed in concealed locations. 4- Shall provide long sweeps for all vertical to horizontal drainage. 5- Shall provide vents for all floor drains and floor sinks. 6- Shall locate the outlet of the vents to water closets above the center line of soil line. 7- Shall provide a 10 foot water test on the system.denied |