Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 11/02/2021 |
BUILDING PRE-SLAB |
|
Approved |
Approved |
| 10/22/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Partial. Slab on grade, gridlines G9 and G10 to GA to GC. |
| 09/29/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Partial. Post tension inspection with Jim B. Level 2 parking deck. Within the gridlines G6 to G10 and GA to GF. |
| 09/23/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Partial. Post tension inspection with Jim B. Level 2 parking deck. The are within the gridlines G1 to G6 and GA to GF. |
| 09/14/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Partial. Slab on grade. Within the gridlines of G6 to G10 and GA to GF. |
| 08/28/2020 |
BUILDING PRE-SLAB |
|
Partial Approval |
Partial. 50% of the west side of parking lot. |