Permit: T20CM00313

Parcel: 12513068A

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
11/01/2021 PLUMBING - ROUGH, SOIL Approved 1010, 3057,2005,3005,1015,3040, 1030, 1045, 2061, 1025, 3036, 4036, 3050, 1005, 2010, 1036, 2036, 2090, 3090, 4090, 2085, 2099. Approved.
12/02/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. Plumbing connection from existing building to new plumbing.
08/06/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. D5 to D6.5 to G6.5.
07/21/2020 PLUMBING - ROUGH, SOIL Not ready for Inspection Not ready, not complete.
07/16/2020 PLUMBING - ROUGH, SOIL Cancelled Canceled by contractor.
07/15/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. Plumbing within the area of F thru H and 7 thru 10.
06/25/2020 PLUMBING - ROUGH, SOIL Not ready for Inspection Not ready, not complete.
06/08/2020 PLUMBING - ROUGH, SOIL Not ready for Inspection Not ready.
05/14/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. West side 6 inch main to 8 inch main. Level 1 N-Middle.
05/07/2020 PLUMBING - ROUGH, SOIL Partial Approval North side wing, From 8 inch main to 6 inch under slab with 4 inch stubouts.