Permit: T20CM00313

Parcel: 12513068A

Inspection Status: Approved

Inspection History: ELECTRIC - UNDERGROUND

Date Description Inspector Results Comments
11/01/2021 ELECTRIC - UNDERGROUND Approved 1010, 3057,2005,3005,1015,3040, 1030, 1045, 2061, 1025, 3036, 4036, 3050, 1005, 2010, 1036, 2036, 2090, 3090, 4090, 2085, 2099. Approved.
09/30/2021 ELECTRIC - UNDERGROUND Partial Approval 2010. Partial. Electric to Northside parking canopy.
03/11/2021 ELECTRIC - UNDERGROUND Partial Approval Partial. Electric conduits (2@4”; 10 @ 3”; 1 @ 2”) from Dolphins Electric Room to transformer: approximately 250’. Ok to cover progress areas.
01/27/2021 ELECTRIC - UNDERGROUND Not ready for Inspection NOT READY CONTRACTOR CANCELLED WILL RESCHEDULE FOR 29 JANUARY
08/04/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. From electrical room 113 to gridline C-7.
07/28/2020 ELECTRIC - UNDERGROUND Cancelled Canceled by contractor.
07/17/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. From electrical room 1 to 2. From electrical room 2 garages located at section F7 to F10.
07/14/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. From electrical room 2 to parking garages within the area of E to F and gridlines 10 thru 16.
07/10/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. From electrical room 2 to garage stub outs for panels.
07/09/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. From electrical room 2(119) to garage G110, G111, G112, G113, G114.
07/02/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. From electrical room #2 to grid lines N-19 thru H-15, (meter packs). From electrical room to Northeast corner of building,(secondary electrical lines from transformer).
06/18/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. Column 19-L thru V.
06/12/2020 ELECTRIC - UNDERGROUND Partial Approval Partial. From R-13 to H-13.