Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/01/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
1010, 3057,2005,3005,1015,3040, 1030, 1045, 2061, 1025, 3036, 4036, 3050, 1005, 2010, 1036, 2036, 2090, 3090, 4090, 2085, 2099. Approved. |
| 08/03/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
1044, 1025, 2035, 3035, 4035. Partial. Level 3. Units 3311 to 3317. |
| 04/08/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial. Dolphins/Steelers/Vikings section. Level four. North Corridor. Eagles section. Level four. North east Corridor #402. |
| 04/02/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial. Vikings/Steelers section. Northside. Levels 2, 3 and four. |
| 03/17/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
. Partial. Building Miami-Steelers; exterior sheathing at Levels 4-6. Ok to waterproof and cover. |
| 03/10/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial. Level four. Steelers/Vikings section. South west corner and Northside, West to East metal Shearwall bracing. |
| 03/02/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial. Interior shear walls in Rooms 2415; 2416; 2417; 2418. Room Unit 120; Fire Pump Room. Ok to insulate and cover walls. |
| 02/24/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial. Vikings/Steelers section. Exterior metal shear panels on level four. Panels are approximately 4 x 14. |
| 02/09/2021 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
Partial. Building 3. Level 4. Eagles section is good. Vikings section is missing balcony bolts and H2.5 clips at stairway. |