Permit: T20CM00313

Parcel: 12513068A

Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Date Description Inspector Results Comments
11/01/2021 BUILDING PRE-SLAB Approved 1010, 3057,2005,3005,1015,3040, 1030, 1045, 2061, 1025, 3036, 4036, 3050, 1005, 2010, 1036, 2036, 2090, 3090, 4090, 2085, 2099. Approved.
01/20/2021 BUILDING PRE-SLAB Partial Approval PARTIAL BUILDING #3 DOLPHINS SECTION SLAB ON GRADE
01/07/2021 BUILDING PRE-SLAB Partial Approval Partial. Partial sunken courtyard area.
01/04/2021 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim. Building 3, Level 4.
12/17/2020 BUILDING PRE-SLAB Partial Approval Partial. Building 3. Level 3, Dolphins section.
12/07/2020 BUILDING PRE-SLAB Partial Approval Partial. Building #3; Level,#3; Eagles Section Post Tension Cable System. Ok to place concrete in progress areas.
11/30/2020 BUILDING PRE-SLAB Partial Approval Partial. Building 3, Level 4, Steelers section.
11/19/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Steelers section. Level 3.
11/12/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Stealers section, level2.
11/05/2020 BUILDING PRE-SLAB Partial Approval Partial. Level 4 Vikings area, post tension inspection with Jim B.
10/22/2020 BUILDING PRE-SLAB Partial Approval Partial. Level #2; Section: Vikings; pour #6. Ok to place concrete in progress areas.

Please charge Sundt APA account $165.00 for after hours performed on 17 October.
10/08/2020 BUILDING PRE-SLAB Partial Approval PARTIAL. LEVEL 4, EAGLES, POST TENSION INSPECTION WITH BRUCE S.
10/01/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 3, Eagles section. Gridlines P-13 to P-20 and V-13 to V-20.
09/21/2020 BUILDING PRE-SLAB Partial Approval Partial. Slab on grade. From D7 to D11 and M7 to M11.
09/17/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Bruce S. Building 3 Level 2. The area within P13 to P20 and V13 to V20.
09/10/2020 BUILDING PRE-SLAB Partial Approval partial. Patio slabs at Q-13, R-13, S-13, T-13, U-13.
08/20/2020 BUILDING PRE-SLAB Partial Approval Partial. Level #1 at Broncos Section. OK to place concrete in progress areas.
08/20/2020 BUILDING PRE-SLAB Partial Approval Partial.. Level #1; Broncos Section. Vapor barrier and rebar in place. Ok to place concrete in progress areas.
07/08/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 4, the area within columns 1 thru 7 and gridlines HH thru WW.

This is a same day inspection request. Charge the contractors APA account $165.00
06/19/2020 BUILDING PRE-SLAB Partial Approval Partial. Patio footings and pre-slab. W-18, W-14.5, W-12.