Permit: T20CM00313

Parcel: 12513068A

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
11/01/2021 EXCAVATION/LAYOUT REBAR & ZON Approved 1010, 3057,2005,3005,1015,3040, 1030, 1045, 2061, 1025, 3036, 4036, 3050, 1005, 2010, 1036, 2036, 2090, 3090, 4090, 2085, 2099. Approved.
09/29/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Parking Canopy on East side, light poles on west side of building.
09/28/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Parking canopy on North and East side.
01/21/2021 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection NOT READY CANCELLED BY CONTRCTOR
01/13/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL, DOLPHINS SECTION, EAST SIDE FOOTING AND STAIRS
01/07/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled
12/16/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Retaining wall for courtyard stairway.
12/03/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. North and east side courtyard, retaining walls.
12/02/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Rebar at courtyard for stairs and ramps.
11/25/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Retaking wall footing at courtyard on north side.
11/12/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Stealers section, level two. Columns and shearwall.
11/10/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready.
11/05/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 4. Elevator shaft.
10/12/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancelled. No calls from contractor.
09/21/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Slab on grade. From D7 to D11 and M7 to M11.
08/24/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Slab on grade within the area of D-12 to P12 and D-20 to P-20.
08/12/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor.
08/07/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancel
08/06/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready, not complete.
07/20/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor
07/16/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor.
07/14/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready, not complete.
07/13/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor.
07/10/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. G1-GD, GE-G1, B-G5, B-G6.
07/09/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at GA-G9, GB-G8, GE-G1, GF-G6, GF-G7, GF-G8, GF-G9. Sheerwall at GC.5- G5 to G6.
07/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Column at gridline G1-columns A,B,C,D&E. GA-G9, GB-G8.
07/07/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at Gridline GF- columns G4, G5, G6, G7
07/06/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Shearwall at GD-G4.
07/02/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready, not complete.
07/01/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at S-14, A-1, B-1, GA-G3, GA-G4, GA-G7, BA-G8, GB-G3, GB-G4, GB-G5, GB-G6, GB-G7, GB-G9, GC-G2, GC-G3, GD-G2, GD-G3, GE-G3, GE-G4, Sheerwall at GC-G4.
06/30/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at GD.5-G8.5, G3-GD.5, G4-GD.5, G7-GB, S-14, D-6, G-2, C-1, B.5-1. Sheerwalls on column G7-GC & GD.
06/29/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Column footings at GL: E/3; F/3; G/3; G/7. Shear walls at GL: G/7; G-D/7. Ok to place concrete in progress areas. (VRI)
06/26/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Five 1’ x 1’ Column footings on GL:1. Ok to place concrete in progress areas.
06/25/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Column at B-6, C-6, D-6, F-6, K-7, D-7. Footings at GE-G5, GE-G6, GE-G7, GE-G8.
06/23/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial . columns at BB-G4, GB-G5, GB-G6, gridline 1-column C thru O.
06/22/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancel
06/19/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Patio footings and pre-slab. W-18, W-14.5, W-12.
06/18/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Columns at D-8, H-8, L-8, L-7, L-5. Footing at F-6, F-7, H-6, Sheerwall footing at G4-GD
06/17/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Sheerwall at GC-G4, GC-G7, GD-G7, GC.5-G5.5.
06/16/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at L-6, L-5, O-1.5, O-2, O-3.
06/15/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at D-9, D-11, D-12, F-8, F-9, P-20, L-12, L-11, L-10, L-9, l-2, I-5
06/12/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. D-13, D-15, D-17, D-19, F-19, H-20.
06/11/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at. H-9, H-11, H-12, F-11, F-12.

Footings at. B-6, C-6, B.5-6, I-1, M-1, M-2, M-3, G-2.

Shearwall at column 5-gridline E thru G, Gridline E- 5 thru 6.
06/10/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at N-18, I-18, M-18, F-17, F-15.
06/09/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Shearwall at gridline D-5 to 6, column 5-E to G. Columns at F-13, F-12, K-20, N-20, N-13, T-16.
06/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. footing at B-1, B-2, B-4, C-4, B.5-1, L-7, L-8, L-12, T-16. Shearwall at column 10-D thru F.
06/05/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancelled by contractor.
06/04/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at L-16, N-14, N-16, P-14, P-16, Q-18, Q-20.
06/03/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at gridline D-columns 8, 9, 11, 12. Gridline L- columns 8, 9. G-4, E-2, E-4, C-1, C-2, C-4, E-1, G-1.

Columns at Q-16, S-14, T-14, S-17, R-13, Q-13.

Shearwalls at column 10-D thru G, column 13-I thru M, pony wall at east side of elevator.
06/01/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready. Contractor cancelled.
05/29/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancelled by contractor.
05/28/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at F-9 & F-8; columns at U-18 & T-18; elevator wall section H-15 to H-16.
05/27/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval partial. Footings at F-11, H-11, H-10, H-5, I-2, I-1. Sheerwall #7 at H-17 thru 19.
05/26/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at R-16, R-20, R-18, S-20, T-20, U-20. Footings at H-12, F-12, H-10, H-9, H-8, H-7.
05/22/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at U-18, T-18, P-20, N-20, M-20, I-20, F-19, D19.

Partial. Columns at B-14, B-16, B-18, B-19.
05/21/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Sheerwall at U-14 to U-16.

Footings at column 20 gridlines Q, R, S, T, U & V.
05/20/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancelled by contractor.
05/19/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Elevator pit/base, at H-15, H-16.
05/18/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footing at V-14, V-18. Sheerwall at H-17 thru 19.
05/15/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at V-16, R-14, Q-14. Wall section Row U 14 thru 16.
05/14/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at gridlines, D-17, D-15, D-13, F-13, F-15 , F-17, S-14, T-14.
05/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings on gridlines 16-K, 16-N, 16,-P, 16-S, 18-S, 18-I.
05/11/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Shearwall #3. Columns on line TT, 13 and 19.