Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA GAS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2021 | POOL/SPA GAS | Approved | Approved and ready to connect, clearance was called into SWG at 9:15am |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2021 | POOL/SPA GAS | Approved | Approved and ready to connect, clearance was called into SWG at 9:15am |