Inspection History Details
Inspection Status: Basin - Good
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | GOOD | |
| 03/03/2021 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | GOOD | |
| 10/02/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | FAIR AT THIS TIME, CONSTRUCTION WORK CONTINUES IN THIS AREA AND A FINAL INSPECTION FOR THE DEVELOPMENT PACKAGE HAS NOT BEEN PERFORMED AT THIS TIME. | |
| 10/01/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Condition Fair. Construction has not started on this site or basin. Per GPS on tablet. | |
| 01/26/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 05/01/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Fair. Site and basin under construction at this time. | |
| 01/25/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | there’s still water in the Basie area from the rains that we’ve been having | |
| 03/17/2026 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Basin inlet is washing out on the south side, needs to be stabilized. | |
| 09/18/2026 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Poor | Washout occurring along side of riprap channel. Erosion along residences block wall. Erosion and sediment buildup on vegetation making drainage difficult. Basin is retaining water. Erosion repairs needed along with vegetation maintenance followed up with structure inspection |
|
| COT - BASN - Drainage/Basin - Annual Inspection - Recur | Scheduled | |||
| 12/20/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin is in good condition. |