Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19RW07813

Parcel: 127122650


Addresses:

5721 E BROADWAY BL


Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Permit Number - T19RW07813

Inspection Description - TDOT-EXCAV GENERAL INSPECTION

Inspection Status - Approved

Date Description Inspector Results Comments
04/16/2020 TDOT-EXCAV GENERAL INSPECTION Approved HANDRAIL IS INSTALLED AND ASPHALT DRIVEWAY IS WITHIN SPEC.
NO ISSUES AT THIS TIME
04/09/2020 TDOT-EXCAV GENERAL INSPECTION Continued NEW SIDEWALK IN FRONT MEETS STANDARDS
04/06/2020 TDOT-EXCAV GENERAL INSPECTION Continued SIDEWALKS ALL IN SPEC
LOOKING GOOD
03/26/2020 TDOT-EXCAV GENERAL INSPECTION Continued POURED SIDEWALK THE HINGE POINT LOOKS GOOD
03/24/2020 TDOT-EXCAV GENERAL INSPECTION Continued MET WITH CONTRACTOR FOR SIDEWALK ON THE WEST END
WILL TAKE OUT CONCRETE BEYOND PROPERTY LINE TO MAKE SIDEWALK ADA COMPLIANT
03/24/2020 TDOT-EXCAV GENERAL INSPECTION Continued MET WITH CONTRACTOR AND TOM ABOUT CURB IN THE ALLEY
WILL ADD A BOLLARD BY TEP POLE AND SHORTEN THE CURB.
03/20/2020 TDOT-EXCAV GENERAL INSPECTION Continued SUBGRADE GOOD FOR THE SIDEWALK.
03/11/2020 TDOT-EXCAV GENERAL INSPECTION Continued HAVE TO MOVE SIDEWALK AROUND THE BACK OF THE LIGHT POLE. WE WILL ADD HAND RAIL BECAUSE IT IS TO CLOSE TO THE RETENTION BASIN. CONCRETE BASE OF POLE IS TO THICK TO CUT
03/09/2020 TDOT-EXCAV GENERAL INSPECTION Continued ONE RAMP ENTANCE WAS OUT OF SPEC CONTRACTOR WILL REMOVE QND REPLACE.
MET ON SITE CALLED TOM AND ADON TO SHOW ME HOW TO MAKE EVERYTHING FIT. WE WILL BE SAW CUTTING CONCRETE PAD FOR STREET LIGHT TO MAKE SIDEWALK FIT BEHIND CURB.
03/03/2020 TDOT-EXCAV GENERAL INSPECTION Continued CURB HAS BEEN POURED
SIDEWALK WILL HAVE TO GO AROUND POLE
02/21/2020 TDOT-EXCAV GENERAL INSPECTION Continued NOT WORKING TODAY
TRAFFIC CONTROL IS OK
02/20/2020 TDOT-EXCAV GENERAL INSPECTION Continued STARTED TO PULL CURB
02/19/2020 TDOT-EXCAV GENERAL INSPECTION Continued MET ONSITE FOR CURB AND DRIVEWAY WORK
FOUND 10 INCHES OF CONCRETE UNDER 2 INCHED OF ASPHALT IN BIKE LANE
MAY CUT CONCRETE AT CURB LINE SO CURB GETS FULL DEPTH
REMINDED THEM ABOUT LESS THAN 2% CROSS SLOPE IN SIDEWALK (AREA)