Permit: T19RW07700

Parcel: 118030710

Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
02/04/2020 TDOT-EXCAV GENERAL INSPECTION Approved Alexs crew was on site to finish asphalt patching( 240-4335) Alex used 17 tons of asphalt for the two days of repairs. No issues and patches match roadway. no issues with underground or backfill. all conduit installed
01/07/2020 TDOT-EXCAV GENERAL INSPECTION Continued Arrived On Site And Met With Contractor. Trench Was Being Excavated In Alley, Notified Contractor That Alley Will Need To Be Restored. Also Notified Contractor That They Could Not Cross Street (Shannon) Due To Not Having An Approved Traffic Control Plan. Trafficade Will Submit A Traffic Control Plan ASAP.