Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/14/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
NPL continues to work in various areas for gas work. Permit was renewed to July. |
| 04/02/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
NPL Gas Main Install. Right Lane closure set up westbound. Temp patches in good shape. |
| 02/24/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon with NPL. Will be starting 2/25 at 9am. Will be submitting for approval for time change. Will start at 9am until approved. Boring all line. Only excavation will be bore pits and potholes. 3 potholes in crossings 2 water, 1 sewer. Adrian N. is Super for NPL. |