Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
R. Olsen covered the night work for pipe relinning on 22nd. Traffic control set to plan and all work was inside existing sewer pipe. No issues or repairs needed |
| 02/03/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
KEG--linning existing sewer, No excavations all work located inside existing sewer. Traffic control set up ok. |
| 01/31/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
KEG relinning existing sewer. Had issues with relinning. called Mike graham to inform him the barricades will up overnight. Issue will be resolved by friday |