Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/16/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Roadway repaired. |
| 12/05/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Tucson Water replaced a fire Hydrant that was damaged. work involved trenching in roadway and sidewalk removal. New sidewalk poured and layed out to go around the new hydrant. New valve box and concrete collar placed in roadway. Cold patch used in roadway. |
| 12/03/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Hydrant replaced. Roadway patched with coldpatch. Sidewalk removed and patched with coldpatch. Hydrant set 6" to low and is in center of sidewalk (original location). Received an email that T.W. will be starting repaires 12/-4/19. |