Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | Tucson water completed the underground repair on 12/9/19 perm asphalt patch in place no issues(8.5x6) |