Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | New concrete collar was added on1/15/20 14 7 asphalt patch restored around the hydrant. No further issues |
|
| 01/09/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | a 2019 hydrant is in place. a 12 x 7 perm asphalt patch is located on Campbell Av. Contractor still needs to repair the asphalt around the hydrant and install a collar around the valve. |