Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | all 6 services are installed 2 asphalt patches along curb. Both patches are 8 x 9. no issues or repairs needed |