Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | CROSS SLOPE IS OK | |
| 01/30/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | SUBGRADE GOOD TO POUR | |
| 01/27/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONCRETE HAS BEEN REMOVED SUBGRADE IS GOOD TO POUR |
|
| 01/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | CONTRACTOR POURED WITHOUT INSPECTION TOLD THEM NO MORE INSPECTIONS UNTIL REMOVED AND REPLACED |