Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | waiting to have fiber handhold relocated. | |
| 06/05/2020 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | TOLD CONTRACTOR TO RENEW EXPIRED PERMIT STILL HAS SOME TEMP PATCHES THAT NEED TO BE TAKEN CARE OF. WILL NEED TO RESEED SHOULDER | |
| 05/21/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCHES ARE OK | |
| 05/11/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | WAITING TO RESEED ASHTON AREA | |
| 04/02/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONTRACTOR ONSITE WORKING ON SHOULDER |
|
| 03/23/2020 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT DRILL ONSITE CALLED CONTRACTOR TO RENEW |
|
| 03/05/2020 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT TRAFFIC CONTROL IN BIKE LANE TOLD TO ADD SHARE THE ROAD AND LITES TO ALL TC LEFT IN ROW |
|
| 03/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NOT WORKING TODAY | |
| 02/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | ON SITE TC IS GOOD |
|
| 01/16/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET ONSITE BORING TO SCHOOL |
|
| 01/15/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |