Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | new copper line installed and a 10 x 21 perm asphalt patch is in place. No issues or repairs needed |