Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | STURGEON ON SITE OVERHEAD |
|
| 01/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | COMPACTION IS GOOD TRICON HAS TEST RESULTS FIRST LIFT OF ASPHALT 2 IN. PAVING SECOND LIFT OF 2 INCHES |
|
| 01/10/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET TUCSON ASPHALT GETTING READY TO PAVE TRENCH ON MONDAY |
|
| 12/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | RAIN TC OK |
|
| 12/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | THEY DID PUT UP A ROADWORK AHEAD AND A SHARE THE ROAD AS PRECAUTIONARY | |
| 11/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | WORKING ON THE HOUGHTON END. PLACING CONDUIT FOR TEP |
|
| 10/21/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |