Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | JOB IS COMPLETE CROSS SLOPE ON LAST SECTION OF SIDEWALK IS GOOD |
|
| 11/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | NEED TO REMOVE SOME ASPHALT ANS LARGER ROCKS THAN RECOMPACT BEFORE THEY POUR | |
| 10/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CROSS SLOPE IS GOOD TOLD THEM THEY HAVE TO CONNECT NEW CONCRETE SIDEWALK WITH OLD ASPHALT SIDEWALK |
|
| 10/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET CONTRACTOR ONSITE SUBGRADE GOOD CROSS SLOPE ON DRIVEWAY GOOD CURB LOOKS REALLY GOOD |
|
| 10/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD | |
| 10/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CURB CUT IS GOOD SUBGRADE IS GOOD |
|
| 10/02/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | PRECON SIDEWALK REMOVAL REPLACE SOME CURB AND SIDEWALK. ONE DRIVEWAY WILL BE REMOVED TOTALLY AND REPLACED WITH 6 FOOT SIDEWALK. 22ND STREET IS UNDER MORATORIUM SO ALSPHALT WILL BE MILLED 2 INCHES AND REPLACED. |