Date Description Inspector Results Comments
03/23/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
09/03/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued- No activity
08/26/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
12/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
12/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
07/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
12/14/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
05/28/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
12/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
05/12/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
12/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
02/26/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - No work on pole.
12/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
03/23/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Northstar backfilled trench. Visual inspection of compacting and processing passes inspection. Plate placed over sidewalk and cold patch placed. Ada wall and plywood placed around remaking trench. Tomorrow night pull light pole and caisson. Place new rebar and form. ROW is clear for the night. James deih is leaving site as Northstar is finished.
12/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Quail restoration compacting material to pace. Am allowing site to be completed outside of permitted time so get asphalt completed today. No houses near all business that are closing by 1700.
12/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Northstar placing rebar for new swf. Will install vaults as well.
12/14/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Northstar vacuum trenching for caisson. Depth is 10’3” will move onto next site when completed.
12/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Met with quail restoration about asphalt. Measuring and marking patches. Will contact for date of restoration.
02/14/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - No work started
11/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued
12/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Private side of water by pole hit by Northstar. They repaired the pvc and spoke to homeowner water is operational.
12/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Northstar boring west to pole from southwest corner of 12th and park. Already bored north across 12th to pedistole location. Will plate roadway too slurry.
11/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Pre con with vertical one. Place pole on north west corner of park and 12. Northstar boring for pedistole
11/29/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Traffic control placed at 0700 per owner of shop on southwest corner. No crew onsite calling Matt with Northstar to notify traffic control to be placed at 0900 and only when crews are onsite.
11/11/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Pre con with velex Northstar trafficade and deih. Quail to be removed from permit and trafficade placed on permit with a revised TCP. Pedistole to be moved south of original location to north west corner of park and 12th per James deih and TEP. Bore route to go south from pedistole to south west corner of 12 and park and straight to pole east of park. Pole on plans shows alley way used tep will not allow that pole to be used due to risers existing. Will ask nick if redesign needs to be submitted or if construction can proceed with redline of plans for bore path since it is greater than 5’ for change.
11/04/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
10/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued- No activity
10/06/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
10/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
09/15/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
11/29/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
12/11/2019 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - work has not started as of 12-11-19