Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave in the alley installing new plastic gas line to homeowner and also installing new gas meters | |
| 02/27/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | ) west end of Campbell Ave on Drexel RD installing new poly plastic line to the Ocotillo Learning Center, school has been notified of work and will reroute student at the end of school day for safety | |
| 02/26/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | installing new poly plastic line service at the address 1731 E Oregon , 1720 E Alaska & 1740 E Alaska | |
| 02/25/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | temporary patch west of Campbell Ave on E Drexel Rd for eastbound traffic, contractor will need to mill steel plates , at the address of 1810 E Alaska St installing new plastic service line to customer | |
| 02/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Dakota St & Alaska St installing service lines also new gas regulator are being installed , also in the alley south of Bantam Rd to Alaska St installing service lines | |
| 02/07/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Bantam Rd & Dakota St installing services in alley way, between Dakota St & Alaska St installing services in alley way, also found illegal dumping in the wash west end of alley way between Holliday & Minorka RD | |
| 02/04/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | West end of Campbell Ave from Drexel Rd going north checking alley ways for house keeping , check asphalt patches on road, need better quality control on patches, need to meet with contractor before job complete | |
| 02/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | West end of Campbell Ave between Bantam Rd & Dakota St installing service lines, between Dakota St & Alaska St installing services, cleaning up other alley ways , housekeeping | |
| 01/30/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/29/2020 Westside of Campbell Ave between Bantam Rd & Dakota St installing services in alley, between Dakota St & Alaska St installing services in alley, between Alaska St & Oregon installing services in alley | |
| 01/23/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Rd between Bantam Rd & Dakota St excavating to setup trench box, between Alaska & Oregon trenching, between Oregon & Minorka installing service line to residents, between Minorka & Holliday installing service line to residents | |
| 01/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/16/2020 west end of Campbell Ave between Alaska St & Oregon St trenching & sleving, between Canada St & Minorka Rd trenching, between Minorka Rd & Holiday St pot holing, between Virginia St and Drexel Rd pressure test gas line at 100 psi | |
| 01/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/7/2020 on Campbell Ave west end from Virginia St pulling about 400' of poly gas line inside sleving towards Drexel Rd , between Virginia St & Holiday St hand trenching , between Minorka Rd & Canada St trenching, between Oregon St & Alaska St pot hole 1/8/2020 meeting with NPL ( Adrian ) City of Tucson - Irrigator (Orlando) over damages done to trees, shrubs, and some irrigation pit boxes, NPL has agreed to replace damage vegetation , and boxes 1/10/2020 ) on the west end of Campbell Ave between Alaska St & Oregon St backfilling and trenching, between Oregon St and Canada St installing residential service line , between Canada St and Minorka Rd trenching and backfill, between Holiday and Virginia St installing residential service line, at the intersection on Campbell Ave and Drexel trenching east on Drexel Rd to S Campbell Ave less than 60 ' total |
|
| 01/02/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | west side of Campbell Ave between Bantam Rd and Drexel Rd walked job site and found several incident of damaged trees, bushes, sidewalk ,curb and litter pertaining to NPL Contractor, made contact with Forman (Lalo) on site and also informed Superintendent (Adrian) . On Campbell Ave past Virginia St heading south will bore 370' to south end of Drexel Rd, between Minorka Rd & Canada St trenching and installing plastic 4" sleving | |
| 12/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | West end of Campbell Ave between Oregon St & Canada St pressure test gas line on both sides of wash heading west about 800 ft. for 1 hour | |
| 12/20/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 12/20/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | westside of Campbell Ave between Alaska St and Oregon St trenching, between Oregon St and Canada St pulled 480' of 4"gas line through sleving | |
| 12/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave trenching between Alaska St & Oregon St , between Oregon St and Canada St finished boring 290' also pulling sleving, barricades and traffic control signs are up | |
| 12/13/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | north east corner of Bantam Rd and Campbell Ave fusing gas line from 4" to 2" and heading west 60 ft , between Alaska St and Oregon St trenching and backfilling | |
| 12/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/10/19 west end of Campbell Ave between Dakota St and Alaska St backfilling and cleaning up alley, between Minorka Rd and Canada St hand trenching locating utilities, between Holiday St and Virginia St cleaning up alley , barricades and traffic signs are up as well as SWPPP waddles in place 12/11/19 ) west end of Campbell Ave between Dakota St and Alaska St in the alley cleaning out sleeve and pulling 840' of 4" gas line through, between Canada St and Minorka Dr. trenching and pot hole in progress |
|
| 12/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | back fill in the alley between Bantam Rd and Organ St heading south , in alley way between Dakota St and Alaska St backfill heading west, in-between Holiday St and Virginia St bored 340 ' W and inserting plastic gas line | |
| 12/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Bantam Rd & Dakota at the end of the alley bored 240' N across Bantam Rd, between Dakota St & Alaska St trenching, at the address 1601, 1611, 1641 E Alaska St sewer line were damaged and repaired, between Canada St & Minorka Rd pot hole , between Minorka Rd and Holiday St cleaning up alley leveling ground, between Holliday St and Virginia St boring W 320 Ft. | |
| 11/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Bantam Rd & Dakota St boring 480' south in the alley, between Holliday St and Minorka Rd pot hole and backfill in alley way, between Holliday St and Virginia St trenching and backfill, also bored 480' west , traffic control and barricades are setup. | |
| 11/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Dakota St and Alaska St trenching and pot hole in the alley, also between Virginia St and Holliday St pot hole in the alley, also between Holliday St and Minorka Rd trenching and pot hole in the alley , *** sewer line was damaged at address 1811 E Holliday St has now been repaired | |
| 11/14/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Dakota St and Alaska St trenching and pot hole in the alley, alley way is closed with signs | |
| 11/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Bantam Rd and Dakota St in the alley back fill complete, cleaned up , alley will be open for the weekend, Between Dakota St and Alaska St in the alley pot hole in alley way | |
| 11/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | west end of Campbell Ave between Bantam Rd and Dakota St trenching, laying 4" pvc sleeve, back filling with AB, communications line damaged at the far end of alley way , NPL has made contact with owners of cable for repair | |
| 11/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | contractor checking sewer lines from Bantam Rd west end of Campbell Ave in the alley south to Virginia St , trenching and backfill in alley between Bantam Rd and Dakota St. | |
| 11/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | cleaning inside of sleve and inserting gas line in the alley between Bantam Rd and Dakota St on the west side of Campbell Ave,trenching and pot holing between Bantam Rd and Dakota St on the west end of Campbell Ave, fusing pipe south of Varginia St west side of Campbell Ave | |
| 10/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | on the west side of Campbell Ave trenching between Bantam Rd and Dakota St. in the alley , fusing poly pipe south of Oregon St. before the alley on the west side of Campbell Ave | |
| 10/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | excavating between Bantam Rd & Dakota Street in the alley west end of Campbell Ave, sewer line broken and repaired north of address 1701 E Dakota Street in the alley, pulling plastic 4" gas line between Virginia St north end to Minorka Rd north end on the west end of Campbell Ave, traffic control and barricades in place | |
| 10/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | boring southbound on Campbell Ave between Holiday St and Virginia St also reaming hole and going to pull 6" sleeve today, backfilling in the alley way west end of Campbell Ave between Bantam Rd & Dakota St | |
| 10/21/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | trenching between Bantam Rd & Dakota St in the alley West Of Campbell Ave, bore complete on Campbell Ave on the south side of Dakota St towards Oregon St on the south side 6" sleeve and 4" gas line have been pulled through, boring on Campbell Ave west end from Holliday St south towards Virginia St. | |
| 10/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | boring complete on the west end of Drexel Rd, lane shift no longer in place , school back in session, no issues for traffic along Drexel Rd,boring on Campbell Ave west side next to alley way between Virginia St & Minorka Rd | |
| 10/15/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | trenching and backfilling west of Campbell Ave between Bantam Rd and Dakota St. in alley way, boring on Campbell Ave between Oregon St and Minorka Rd on the far west end next to alley way, west of Campbell Ave boring complete on Drexel Rd, school back in sesion | |
| 10/11/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | boring on Drexel Rd. eastboud towards Campbell Ave. 376 ft complete, pulling 6" sleve, trenching and backfilling in alley west of Campbell Ave. between Bantam Rd. and Dakota St. | |
| 10/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | trenching in alley between Bantam Rd and Dakota St. west end of Campbell Ave, Cox main feeder cable damaged - Cox personal on site repairing damages, boring west of Campbell Ave on Drexel Rd. 370 ft complete 6" sleve in place | |
| 10/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | signs and traffic control in neighborhood, storm drains have sand bags, escavating beteewn Bantam Rd and Dakota St in easment Westside of Campbell Ave. also boring on Campbell Ave far west end on easment heading southbound towards Drexel Rd, | |
| 09/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | checked on jobsite, message board has been set-up for sb traffic, NPL has begun to stage material, temporary fence has been set-up along with waddles around perimeter, ES has removed its containers from easements, NPL (Adrian Noriega) stated work should be starting on 9/30/19 weather permiting. | |
| 09/20/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Pre con with NPL representatives Adrian Noriega/Gerardo Inclan/and Judy Boyer, discuss message board, Judy stated that they have made contact with residents, also notified the school on Drexel Rd, Environmental Services has been made aware that trash bins in alley need to be removed, work to start on 23SEP19 |