| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Closed | See permit T20RW00506. Completed. Closed. | |
| 01/24/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Punchlist not completed. | |
| 01/09/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor still working on punch. Called to remind contractor to complete the work. | |
| 12/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Rain day. Unable to verify work. | |
| 11/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | No sign of work on punch list items. | |
| 11/04/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspect T19RW05078 - Appears completed. Ran punch list and called it into contractor. 1. Asphalt repair not acceptable. 2.Several areas of sidewalk have new brakes. 3. Handrail needs repair. 4. Cleanup landscaping. |
|
| 10/31/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Barricades up, cleaning streets to allow for streets to open. | |
| 10/28/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Bypass pipe being removed. Barricades in place. | |
| 10/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Barricades were knocked down due to high winds, called Border Barricades to have them come out and re-set the barricades with sand bags. B&F Contracting notified that barricade company was re-setting all barricades. Informed that the by-pass is completed and they are starting to dismantle the pipe. Will be working on rpairing roadway later next week |
|
| 10/21/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Barricades up, by-pass system appears to be working correctly. | |
| 10/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Barricades in place. Pressure testing pipe. | |
| 10/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspect T19RW05078 - Received a call from a civilian about possible problem with a concrete barrier at east bound Speedway. Found contractor performing a revision to their temp. line layout that required them to park a forklift partly in a travel lane with 1 flagman to shift traffic over. Told them must stop this immediately and get barricades. They had just finished with the forklift and so they removed it and opened up traffic | |
| 10/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Work is a 18" sewer by-pass crossing bridge. Sidewalk will be moved temp. to bus lane closed to traffic. Start next week. |