Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/28/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Asphalt roadway repaired. |
| 10/07/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Permit renewed. Curb removed and poured, sidewalk replaced. Told owner taht short piece of oldcurb has settled and needs to be replaced as previously discussed. Asphalt damaged and will need to be replaced along new curb. |
| 10/02/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Called owner and notified him that permit expired and needs renewal if planning to do work. |
| 09/25/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
No work. |
| 09/04/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon at 1:30. Old curb has cracks so need to remove and install new depressed curb, sidewalk is broken and needs replaced, will connect to existing drive to north. Possibly will use brick pavers. |