Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | ASPHALT PATCH BEHIND CURB HAS BEEN COMPLETED | |
| 08/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | WE CLOSED 2 WESTBOUND LANES TO REPAIR PATCH. ONE CONER OF PATCH HAD CONCRETE AT 2 INCHES IN THE NW CORNER OF PATCH. OPENED THE FIRST LANE AT 815AM THE SECOND ONE AT 10. WE REPLACED 7.5 INCHES OF ASPHALT FROM CURB TO LANE LINE. REPAINTED THE WHITE LINE AND THE BIKE LANE LINE. NEW SIDEWALK SUBGRADE IS GOOD REPLACED 6 INCHES FOR DRIVEWAY. 3000 PSI |
|
| 08/21/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH HAS FAILED. I CLOSED DOWN THE RIGHT WESTBOUND LANE DUE TO UNSAFE ASPHALT. CONTACTED TW THEY WILL BE ONSITE AT 5AM TO INSTALL PERM PATCH |