Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T19RW04474
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/25/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | any stripping that was damaged by the contractor has been replaced, no further action is required with this permit. CLOSED | |
03/27/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | walked through with Adan G. check asphalt of contractor no major issues all that is left is stripping of the cross walks and stop bars | |
03/26/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 3/24/20 Alameda and Main contractor removing steel plates on Main Avenue between Alameda and Franklin will slurry later on during the day, slurry various spots on Main Ave and resetting steel plates 3/25/20 Alameda and Main Ave contractor removing steel plates asphalt contractor P1 preparing to mill asphalt and pave later on today,paving on Main Ave all asphalt should be completed today 3/ |
|
03/23/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Alameda and Maine at the address of 218 N. Main and at the address of 273 N. Main contractor will squeeze existing plastic gas line and purge out natural gas, City Hall and Tucson water have been notified, cleaning up sidewalk is closed at the north east corner of Main and Washington just for tonight | |
03/20/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Alameda and Maine contractor is boring from Main Avenue going east bound on Alameda installing plastic sleving and gas line | |
03/18/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | in front of address 255 N Main Ave contractor is boring onto private property, ) Fugal is installing plastic sleving and also new plastic gas line from Main Ave onto private property at 255 N Main Ave | |
03/16/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | contractor Fugal working in front of address 255 N Main Ave , removing plates and trenching , road closed between Washington and Franklin St on Main Ave, saw cutting asphalt, trenching, and assembly of poly line to tie into new gas poly line | |
03/10/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 3/9/2020 P1 Paving will be paving between Franklin St and Washington St on Main Ave traffic control setup with road closure in-between *** at the intersection of Main Ave & Paseo Redondo contactor ran out of Asphalt will repave SW Corner when they return | |
03/02/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | contractor (Fugal )will slurry today in front of address 245 N Main Ave | |
02/27/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | ) Fugal working on N Main Ave between Alameda St and Franklin installing new plastic poly line also SW Gas on site addressing a small gas leak from old pipeline , issue has been resolved | |
02/25/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | ) new service line has been installed at the address 216 N Main Ave , currently working at address 235 N Main Ave but having difficulty locating existing gas lines as well as sewer line specialized contractor will be on site tomorrow to locate | |
02/24/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Fugal will start to work on poly gas line install for homes and business on Main Ave south of Franklin St to Alameda | |
02/19/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | contractor P1 will pave intersection and will also pave North on Main Ave to the front of address 140 N Main Ave , traffic control setup with flaggers , no issues | |
02/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | check job site for any potential issues since job is on hold due to Gem & mineral Show, found no issues with temporary patches or steel plates on roadway | |
01/30/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/27/2020 Installing the last of poly gas line at the intersection of Alameda & Main, traffic control with flaggers 1/28/2020 ) Installing the last of poly gas line at the intersection of Alameda & Main, traffic control with flaggers, intersection of Main & Alameda contractor finalizing work , SW Gas to abandon old poly gas line , traffic control setup with flaggers , sand and slurry scheduled for tomorrow 1/29/2020 Intersection of Main & Alameda all gas lines have been installed ,gas pressure is up , SW GAS has approved work , remove trench boxes and backfill & slurry , plates will be left on until after Gem & Mineral Show the contractor will re- pave until then , traffic control setup with flaggers |
|
01/30/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/30/2020 Intersection of Main & Alameda Ave readjust steel plates , add new cold patch, weld all plates together , Fugal is to maintain ALL plates and cold patch for the next two weeks during the Gem & Mineral Show, general housekeeping , sweeping, and removal of all traffic control signs for the duration of the Gem Show | |
01/24/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | new contractor (P1) will finish any asphalt that's needed, very large patch to be done in front of address 419 N Main Ave, contractor is aware that no vibration shall be performed . talked with Lance about progress of project and was advised to inform contractor that January 30,2020 will be the last day to clean up work area for the next 3 weeks due to Gem & Mineral Show , contractor will weld plates at the intersection of Main & Alameda and will maintain during the shut down also all plates on Main Ave will be looked at and add cold patch where needed and also maintained during Gem Show, on the north east corner of Main & Franklin installing new poly gas line | |
01/23/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | on Main Ave south of Franklin St on the east end pot hole for services to residents homes , on the North East Corner of Washington St & Main trenching for existing poly gas line to tie-into | |
01/21/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | steel plates need to be secured and add more cold temp patch , resetting steel plates at the intersection of Main & Alameda St also adding back fill to prevent any under mine at crosswalk area | |
01/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/16/2020 paving at 419 N Main Ave contractor asked to pave from e/curb to w/curb and minamize joints in new asphalt, in the intersection of Main & Franklin trenching and pot hole, at the intersection of Main Ave & Alameda miiling plates (Hurrican Milling ) creating lots of dust was asked not to continue untill water was on site to minimize dust control | |
01/15/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/14/2020 SW Gas steel gas line is in service now , old steel gas line has been purged with nitrogen and air and has been caped, paving on Main Ave just south of Paseo Redondo, on the NEC of Main Ave & Franklin pot holing & trenching, in front of address 419 N Main Ave wrapping steel gas line backfill & slurry , road to open today by 5:00pm Lance,Gloria & Erica have been updated | |
01/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/13/2020 ) traffic control setup with flaggers NO Traffic Issues, SW Gas on site adding odor agent to steel gas line will release around 10:00 am TDOT - PR , Gloria S and Lance P have been made aware, 2:30 pm spoke with Lance P about the evacuation that happened earlier due to SW Gas odor release, SW Gas will work tonight and finish to prevent a reoccurrence scenario during the day, traffic control is setup with flaggers and with light plants for visibility,TDOT on call inspector will check on job site during the night | |
01/10/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/9/2020 Traffic control setup flaggers in place NO Traffic issues , Nitrogen gas released at 10:00 am no major issues , welders have finished welding all fittings needed for SW Gas to be able to tap into main line on Monday January 13th 2020 | |
01/09/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1/8/2020 SW Gas did not approve Nitrogen test , will retest on 1/9/2020 starting at 8:00am if approved then Nitrogen will be released on Main Av e & Alameda St around 1-2 pm, Traffic Will Not be impacted | |
01/07/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | on Main Ave wielding last pieces to be able to pressure test system and then tap into existing gas line, traffic control set-up with flag- men NO TRAFFIC ISSUES | |
01/07/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | ROAD CLOSED between Alameda Street and Paseo Redondo on Main Ave for both directions North & South from 9:00am to 3:30 pm M-F Jan. 6th thru Jan 17th Contractor has begun to fill gas line with Nitrogen to preform test, will advise the City of Tucson Inspector before line is purged to inform TDOT and City Manager's office |
|
01/06/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | intersection of Main Ave & Alameda St cleaning with high water pressure around existing gas lines to place 2nd trench box for tie-in , from Paseo Redondo to Alameda St fusing the last poly gas line, back-fill and slurry, traffic control set-up with flaggers NO TRAFFIC IMPACT | |
01/02/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | No work today , staff was being utilized at different location 10 Ave and 19th Street , work to resume tomorrow | |
12/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/26/19 observe traffic control setup, is to flow in both directions East/West on Alameda St with flaggers at each point on Main Ave heading south from Washington St about 150 ft. steel gas line and poly have been slurry, steel gas line in front of museum heading south to Alameda St has been backfilled and poly to be installed 12/27/19 Pot hole in the middle of the intersection of Main Ave & Alameda St and exposed new gas lines not on plans, in front of address 419 N Main Ave backfilled around trench boxes and also slurry to prevent any further damage to road from rain 12/27/19 No work due to rain |
|
12/23/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/20/19 **NIGHT WORK ** 7:00 pm traffic control set-up , milling on Alameda St for new trench box, cleaning with high water pressure around existing utilities and proper depth for new gas line to be installed 12/21/19 5:00 am west bound traffic lane was open on Alameda St and Court Ave traffic flowing in both directions, new traffic control plan in place , no issues with traffic , steel gas line being wrapped and sand bedding in trench to lower gas line into trench. 12/23/19 drop off traffic control plans for work on 12/26/19 approved by Fred Felix , traffic must continue to flow , also housekeeping, street sweeper , and checking on asphalt crew on site |
|
12/20/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/19/19 ** NIGHT WORK ** re-excavating trench box set in place , need to expose high pressure gas line between 5 to 7 feet east for new pipe installation complaints from HOA from noise at night , SW Gas is aware and has made contact with residents, contractor has made progress will continue on tonight to install another trench box ** DAY TIME ** paving south on Main Ave just past Washington St , x-ray of steel gas line welded , house keeping , ** NIGHT WORK to start at 7:00 pm tonight. Made contact with SWG and Fugal will meet tonight at 7:00pm discuss traffic plan for 7:00 pm and transition into 5:00 am until 5:00 pm |
|
12/19/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/18/19 *** Night Work *** milling on Alameda St just south of Main Ave, escavating found main high presure gas line with unexpected fittings will need to move over East per South West Gas, staging steel gas line for welding later on during the day, *** NIGHT WORK to continue at 7:00 PM TODAY 12/19/19 *** 12/19 19 ** Day Time - staging steel gas pipe, on Main Ave near Alameda St, paving on Main Ave south towards Washington St. |
|
12/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/17/19 ) on Main Ave fusing plastic gas line towards Paseo Redondo and backfill trench with sand , slurry mix later during the week, trenching south of Paseo Redondo towards Alameda St, Public has been informed of road closure on Main Ave North of Franklin, contractor is aware that road needs to be open asap but safe to drive on, night work starting tomorrow | |
12/17/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/16/19 ) trenching on Main Ave from Paseo Redondo heading south toward Alameda St, permit has been approved for night work - contractor starting on Thursday December 17th, *** Road is closed for North-bound on Main Ave at the address 423 N Main Ave due to road cave-in while under construction **** |
|
12/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/10/19 paving permeant patches on Main Ave between 6th street and Franklin St for Southbound Traffic only ,milling plates on Main Ave from Washington St to Paseo Redondo, due to rain on Monday section of road was wash-out underneath by the address 423 N Main Ave, downtown has been made aware (Lance P. ) a proposal will be needed from FUGAL & SONS on how to correct issue before backfilling, steel plates 16X8 are being used at this location 12/11/19 paving on Main Ave south of Franklin St, trenching on Main Ave south of Washington St towards Paseo Redondo, installing large shore box near address 423 N Main Ave current depth is about 12 ft. deep |
|
12/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/6/19 revised permit for TCP has been accepted for the weekend, pot hole still in progress from yesterday, plastic gas line being fused on Main Ave heading south towards Washington St , will backfill today , also asphalt crew on site 12/7/19 ) paving crew recommended by SW Gas had several issues getting started in the morning, equipment not functionally properly, proper equipment not on site for dust control had to wait to bring water, personal on equipment not very experienced , actual pot hole start time was about 12:00 pm to 4:30 pm, no traffic lanes on Alameda St were closed and pedestrians were accommodated , slip resistant tape was placed on steel plates on the North Side of Alameda St on Main Ave . 12/9/19 No work due to rain |
|
12/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 12/3/19 south of Franklin St on Main Ave backfill with sand , gas line is 36" below grade, also milling South towards Alameda St. Contractor trying to revise permit due to unforeseen circumstances. 12/4/19 slurry south of Franklin St on Main Ave , staging plates , cleaning up work zone , traffic control set up |
|
12/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | from Alameda St to 6th St on Main Ave cleaning steel gas line with utility pigs, daycare center near by was made aware of load noise and dust that would occur | |
11/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 11/18/19 on Main Ave between Franklin St and Paseo Redondo tried to pull out steel gas line but were unsuccessful will bring larger equipment tomorrow, staging plates back in place open road for the night. 11/21/19 steel gas line has been pulled out of ground on Main Ave from south Franklin St to Paseo Redondo , traffic control set-up. 11/22/19 traffic control set-up , checking lights on barricades, possible no work on Saturday due to El Tour De Tucson 11/25/19 re-boring from Alameda St to Franklin St on Main Ave, spoke with Gloria S and granted authority to close intersection of Franklin St and Main Ave, TFD and public information officer have been made aware of situation, steel line being inserted under ground, drilling equipment blew a cooling line - set back 1 hr. to fix, informed downtown of situation, re-weld last section of steel gas line-ray and wrap, final ok from SW GAS to continue, intersection was reopened at 4 :45 pm and informed downtown. 11/26/19 on Main Ave north of Franklin St backfilled potholes with sand and poured slurry, should be paving on Monday |
|
11/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CP corrosion test on steel gas line has passed, steel plates welded in place for weekend , no work until Monday Dec 2, 2019 | |
11/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 11/13/19 x-ray of all welds , staging steel plates, housekeeping , traffic control set-up. 11/14/19 ) x-ray welds have passed , re-wraping steel pipe. 11/15/19 final warp of steel pipe , staging equipment for Saturday to re-install gas line underground, traffic control set-up 11/16/19 on Main Ave from 6th street to Franklin St just south of the intersection re-bored and re-install steel gas line , no issues | |
11/14/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | pulling out steel gas line from 6th street to Franklin on Main staging pipe on Main between Franklin and Washington on the west end, cut off previous welds, re-weld ,x-ray ,and wrap all over again per SW GAS ) x-ray of all welds , staging steel plates, housekeeping , traffic control set-up | |
11/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | sweeping sidewalk and street, picking up trash, no schedule work until next week Nov 12,2019 due to long weekend and festivities going on downtown during the weekend | |
11/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | starting all over saw cutting, milling and pot holing due to steel pipe bing pulled out, traffic control set-up, no parking signs in place | |
11/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | **** The entire steel gas line will have to come out , cut steel in to sections re-weld and x-ray due to welder not having proper credentials to perform tasks. | |
11/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 10//29/19 staging plates over open trench, weilding plates to prevent movement from night traffic, employeess left early to office meeting, traffic control setup 10/30/19 JOB ON STAND BY ISSUE WITH WELDER CERTIFICATION |
|
11/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 10/31/19 JOB ON STAND BY ISSUE WITH WELDER CERTIFICATION, ) sweeping street and side walk, picking up trash, re-ajusting traffic control devices | |
10/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | open trench south of Franklin St. on Main Ave, unknown /unmarked line damage in front of address 262 N Main, staging metal plates | |
10/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | milling south of Franklin St on Main Ave, all underground bore for gas steel complete, also marking out area for open cut trench for plastic gas line | |
10/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | pot holing south of Franklin St, paving on Main Ave between 6th St and Franklin | |
10/21/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | pot holing south of Washington on Main Ave, 24" of bedding of sand on new steel of gas line, slurry all the way up just below existing asphalt,) hydraulic shoring for a trench box to be used by workers, while excavating found a bottle from the 1880s | |
10/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | wielding pipe together, x-ray welds on pipe, pot holing, cleaning pipe where it was welded and applying coating, saw cutting, at about 2:00pm steel pipe is being pulled underground NB on Main Ave from Franklin towards 6th Street | |
10/15/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | pot holing, staging pipe on the west end of Main Ave along curb, boring equiptment setting up along Main Ave, traffic control set-up | |
10/11/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | south of Franklin St. on Main Ave. saw cutting, pot holing, looking for unmarked sewer line, contactor was able to locate it, work will continue on Saturday | |
10/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | pot holing on Main Ave southbound traffic, a small tree branch was damaged and was reported to SW Gas Inspector, saw cutting and staging steel plates. North West Corner company MEARS Group is patching, equiptment blocking traffic for north bound had them move ,also asphalt on sidewalk area and small piles throughout job site including water bottles,wrappers, and left over fruit, informed work crew that area is to be maintained clean. | |
10/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | job has started, Ivan Cordova is forman for Frugal on site,traffic control setup, pot hole inprogress, steel plates on road, talked with neighbors,small tree branch damaged informed SW Gas Inspector Michael Hromidko | |
09/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | checked on job site, no workers present, some saw cuts, nothing major. | |
09/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Precon with Fugal and SWG. Sawcutting to begin 9/17 for potholing. Traffic control will be done by Fugal. SWG must submit for time change to reflect work schedule. TNE must be obtained before night work on Alameda. Slurry backfill only. |