Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
Permit Number - T19RW04391
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/23/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Project completed except for one pothole in the street. Notified Larry with Vellex and he will have a crew out to do the repair in the next couple of days. | |
04/14/2021 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
12/30/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Notified Larry that there is an area that potholes were developed but not filled in and covered with plywood sheets and traffic cones. This needs to be corrected. | |
04/12/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - No sign of work at the road repair at pothole. | |
12/21/2020 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - All construction work completed. Pole installed. Meter pedestal installed. All boxes in ground. Site graded and landscape reinstalled. Roadway not affected. Sidewalk not affected. | |
04/06/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Barricades will be needed when they come out tomorrow to repair the pothole in the street. | |
12/04/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole installed. Boxes installed. All work performed in dirt shoulder. Sidewalk and roadway not affected. Site cleaned up. | |
03/23/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Still need to repair a pothole in the street. | |
11/24/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole installed. No lightbar. Crews working on pulling cable through existing conduit from power pole. Barricades up around pool area. | |
09/24/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - New footing and pole installed. No light arm. Boxes set. Barricades up. Sidewalk and roadway not affected. | |
12/30/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Continued | |
08/17/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake. | |
12/21/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Continued | |
03/10/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake. | |
12/04/2020 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Approved | |
04/14/2021 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Project completed. All components of tower site installed. All work performed in landscape dirt shoulder. Sidewalk and curb not affected. Pothole in roadway repair. Landscaping gravel restored to original condition. Meter is set. Permit closed. | |
04/12/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Roadway repair required add pothole for the electrical conduit run. | |
01/17/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake. | |
11/24/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Continued |