Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/05/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Valve box concrete collars completed. |
| 09/05/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Concrete collars at valve boxes completed. |
| 08/23/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
East bound lanes - remove cold patch, compact and test, place asphalt in 2 lifts. With barricades. |
| 08/22/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
West bound lanes - remove cold patch, compact and test, place asphalt in 2 lifts. With barricades. |
| 08/21/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pressure testing pipes under roiadway. Working on cold patches. |
| 08/20/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Repaired cold patch. Roadway repair starts 8/22 |
| 08/15/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Placed 2 pipe crossings in Ft. Lowell, cold patch roadway. Heat making patches soft and are repairing them. Told contractor must place asphalt ASAP. |
| 08/09/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pot hols at crossings with cold patch. |
| 08/06/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon at 9am. 2 water crossings in Fort Lowell Rd. Recessed plates required or cold patch till asphalt is placed. ABC backfill or slurry mix. |