Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
new gas line installed and in service, the trech backfill was all slurry at my request. The asphalt patch is not accepted, was not recut as a T top, however a new electric line is being installed next to trench and the company said they would repave the whole area after conduit install. No other issues and permit is closed ( Morturary gas line ) |
| 10/03/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
potholing 0n 10/2. Met with contractor and discussed slurry backfill and T top asphalt patch. Slow work today, contractor had to call in a re blue stake. Couldnt find electric. Flaggers used all day |