Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | work started on 7/25 contractor installed pipe and waited on pima county inspection 7/26/19 area backfilled with ABC 7/29/19 5x21 asphalt patch in place. No issues or repairs needed |