Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Att pole placed. Landscaping restored. Fiber and electric placed. Site passes ROW inspection | |
| 03/12/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Continued pole has been installed. Power box and hand holds are in. | |
| 02/18/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Continued | |
| 11/03/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Continued hand hold installed | |
| 06/03/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - NO WORK VISABLE | |
| 05/11/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - NO WORK VISABLE | |
| 04/28/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - RENEWED PERMIT NO WORK |
|
| 03/25/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - EXPIRED PERMIT NO WORK |
|
| 09/03/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. |