Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
all work complete, walk through finished last part of permit used exsitiong conduit. |
| 09/04/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
all conduit was installed per plan, new cement treated base was added under sidewalk brick work. All bricks were reinstalled and concrete which was damaged was replaced per my instructions. Walk through today for final repair work. All barricades and repairs will be complete by next week |